How we work · Theory of Constraints

Interactive presentation · click anything for an explanation

Theory of Constraints

The weakest link
first

Every organisation has, at any moment, exactly one brake on its throughput. Improve anywhere else and nothing changes. This session is about finding that brake, and what you do with it next.

Find Focus Repeat
Speaker notes

This is a session on the Theory of Constraints, Eliyahu Goldratt's theory from his book The Goal. Not as theory to know, but as a lens to look at your own chain: where is the brake, and are we working on it or are we busy somewhere else.

Three words to hold on to: find, focus, repeat. Find the brake, focus everything on it, and start again as soon as it moves.

This deck rests on the vault note theory-of-constraints and on the way of working of the iAi model.

The main line
A chain is as strong as
its weakest link. Every system with a goal is limited, at any moment, by exactly one bottleneck: the constraint. Working harder anywhere that is not the constraint gains nothing for the whole. So the art is not to work harder everywhere, but to find the constraint and focus everything on it.
Speaker notes

If you remember one sentence: a chain is as strong as its weakest link. It sounds like a proverb, but the consequence is hard. Everything you improve in a place that is not the weakest link changes nothing about what the chain delivers as a whole.

Goldratt calls that link the constraint. There is always one. Never zero, and rarely more than one at a time.

01 · Find · play it out

Five steps from order to delivery. What does the chain deliver?

Throughput of the whole chain6orders per day
Click a button on the right and watch what happens to throughput.
Speaker notes

A simplified chain: orders in, planning, production, inspection, shipping. Each step can handle a number of orders per day. Production can do six. So what does the chain deliver? Six. Not the average, not the sum: the lowest.

Click "faster planning". Planning can now do sixteen a day, and throughput stays at six. The only thing that grows is the pile of work waiting for production. That is the yellow stack. Click "faster inspection": same story.

Then click "faster production". Now throughput goes up, to nine. Click once more: production can do twelve, and the brake moves to shipping. That is the whole story in one picture: only improving the constraint counts, and afterwards it moves.

01 · Find · what you steer on

Goldratt measures an organisation by three things

Throughput

Throughput

The rate at which the system makes money through sales and delivery. Not what is made, but what is delivered and paid for.

Up, without a ceiling
Inventory

Inventory

All the money tied up in the system: material, semi-finished goods, work in progress, but also unfinished projects and open files.

Down
Operating expense

Operating expense

The money you spend to turn inventory into throughput: people, machines, energy, licences.

Down, with a floor

The winning move is almost always raising throughput, not cutting cost. Cost has a floor, throughput does not.

Speaker notes

Before you look for the constraint, you need to know what you steer on. Goldratt uses three measures. Throughput: what you earn, per day, per week. Inventory: everything that is tied up and has not yet delivered anything. Operating expense: what it costs to keep the system running.

Most improvement programmes sit on the third: cut cost. But cost has a floor. Throughput does not. That is why ToC looks first at what limits throughput.

01 · Find · what you are really improving

Improve the system, not one part

The goalWhat you want to achieve, clearly describedSo clear that every manager at every level can work back to the work and the resources they need
WorkThe doing

Making your product or service: the steps from demand to delivered and paid.

ResourcesWhat you need, and how much

Demand, capacity, supply, cash, attention. Not enough of any one of them: that is the constraint.

RulesHow you win the game

Which rules steer work and resources? Sometimes a rule itself is the brake.

MetricsFeedback to learn from

Lag: are we reaching the goal. Lead: why not. Compliance: are we following the rules.

"The aim of all science is to substitute visible complexity with invisible simplicity."Jean Baptiste Perrin, physicist (1870-1942). Every organisation looks complex; the constraint is the simplicity underneath.

Speaker notes

Before you improve anything: what are you improving? A system. Every system has five parts. A goal. Work to reach that goal. Resources to do the work. Rules to steer work and resources. And metrics that give feedback: lag, are we reaching the goal; lead, why not; compliance, are we following the rules.

The classic approach improves each part on its own. That gives better parts, not a better system. The sum of local improvements is not a system improvement. The resource you do not have enough of, that is the constraint, and that is where the leverage is. Perrin said it: all science replaces visible complexity with invisible simplicity. In an organisation the constraint is that simplicity.

02 · Focus · the five focusing steps

Found it? Then focus everything on that one link

Step 1Identify

Which link limits throughput towards the goal? Look where the work piles up.

Step 2Exploit

Get everything out of it without investing: no idle time, no waste, only the right work through it.

Step 3Subordinate

Align everything else to the pace of the constraint. Do not run faster than it can handle.

Step 4Elevate

Only once 2 and 3 are exhausted: invest to lift the capacity of the constraint.

Step 5Repeat

The constraint is solved and moves. Back to step 1. Do not let habit become the new brake.

↻This is not a project with an end. It is a loop, and steps 2 and 3 are almost always the cheapest win.
Speaker notes

Goldratt gives five steps. One: identify. Two: exploit, get out what is in it without spending money. A machine that stands idle an hour a day because the operator takes a break is a free hour of capacity. Three: subordinate, the rest of the organisation follows the pace of the constraint. This is the hardest step, because it means other departments deliberately do less.

Four: elevate, now invest. And five: repeat, because the constraint is now somewhere else. The trap is that the rules you made in steps 2 and 3 linger while the constraint has long moved. Then the habit is the new constraint.

02 · Focus · what subordinating looks like

The constraint sets the beat, the rest follows

Ordersinflow
Planningfollows
buffer: never without workProductionthe drum
Inspectionfollows
Shippingfollows
rope: inflow at the pace of the drum
No more enters the system than the constraint can get out. That keeps work in progress small and lead times short.
Speaker notes

In production, subordinating is called drum-buffer-rope. The constraint is the drum: it sets the beat. In front of the drum lies a buffer, a small stock of work, so it never stands idle. An hour lost on the constraint is an hour lost for the whole chain; you never make it up.

And the rope ties the inflow to the beat of the drum: no more work enters the system than the constraint can handle. That keeps the pile small and the lead time short. Outside production it works exactly the same: a helpdesk, an analysis team, an approval step.

02 · Focus · Alan Barnard's five pairings

One to one: from goal to the one experiment

How do you tell, out of everything you can improve, the one thing you must change? By pairing one "what" with one "how" at every step. Never one to many.

Pairing 1Goal→Constraint

One goal, income or impact. One resource you do not have enough of. Quick check: what is the work waiting for?

Pairing 2Constraint→Problem

The shortage is made of problems. One of them gives at least half the gap. That is the problem for now.

Pairing 3Problem→Conflict

The solution collides with the status quo. Each side has its own pros and cons. Write the conflict out.

Pairing 4Conflict→Innovation

A solution without trade-offs: all the pros, none of the cons. That is the requirement for the solution.

Pairing 5Innovation→Experiment

Test one assumption: do we now have more of the scarce resource? Then back to pairing 1.

↻Next problem, or next constraint? You do not learn from experience, you learn from experiments.
Speaker notes

The five focusing steps say where to push. Alan Barnard, a student of Goldratt, turns that into a method you can repeat at every level: five pairings, each a one-to-one relationship between a what and a how. Goal and constraint: one goal, one resource you do not have enough of. Constraint and problem: the shortage is made of problems, and Pareto is fractal, so one problem gives at least half the gap.

Problem and conflict: the solution is one side of a conflict with the status quo, and until you write that conflict out you get stuck or you overreact. Conflict and innovation: a solution without trade-offs, all the pros and none of the cons, that is the requirement. And innovation and experiment: test one assumption, do we now have more of the scarce resource. Then back to the start: same constraint, next problem; constraint moved, start again.

The counter-check
What you often hear"With us it is everywhere. Everyone is busy, so everyone is the bottleneck."
  • Busy is not the same as constraintBeing busy can also mean doing work the constraint will never process. Look where the work piles up, not where the sweat is.
  • Local efficiency can be harmfulA department running faster than the constraint builds inventory, hides the real problem and costs money.
  • But: ToC is not everythingToC says where to push, not how hard and not whether you may. Limits on people, market and mandate still stand. And sometimes the constraint is a rule, not a machine.
Speaker notes

The counter-argument we hear most often: with us it is everywhere. It feels that way, but it is rarely true. Being busy is not the same as being the constraint. Look at where the work is waiting, not at who runs hardest.

And an honest footnote: ToC tells you where to push. Not how hard, and not whether you may. People, market and mandate have limits that are not in the model. Sometimes the constraint is not a machine or a department but a rule. That is what the next slide is about.

The counter-check · discipline
From a workshop by Alex HormoziA chiropractor with a capacity constraint asks: "Can you tell me more about getting leads through Facebook?"
  • "Why are you asking about leads?"That is not the problem you are solving. You are looking for more capacity, at the lowest cost and the lowest risk. Anything that does not add to that is distraction, however interesting.
  • Audits and best practices make the list longCompare every department with best practice and you find a gap everywhere. Every gap goes on a list, and management is overwhelmed.
  • One to one is the only way outOne goal, one constraint, one problem, one conflict, one innovation, one experiment. Not one to many. That is what holds the focus when everything looks interesting.
Speaker notes

An example of discipline. In a workshop by Alex Hormozi everyone had first named their goal and their constraint. A chiropractor short of capacity then asked about lead generation through Facebook. The answer was blunt: why are you asking about that? That is not your problem. You are looking for more capacity, as cheaply and safely as possible.

That is also why audits and best-practice comparisons go wrong so often. You find a gap everywhere, every gap goes on the list, and nobody gets to steer any more. The only way out is to guard the one-to-one relationship: one goal, one constraint, one problem. The rest can wait, even when it is interesting.

01 · Find · where to look

Four places where the constraint hides

Capacity

A step that cannot keep up

A machine, a team, one person with a skill nobody else has.

a pile of work in front, idle hands behind.
Policy

A rule that slows throughput

An approval step, a batch size, a "that is how we do it here". Often clever once, now a brake.

nobody remembers why, but everyone waits for it.
Market

Too little demand

The chain can do more than is sold. Then the constraint sits outside the door and sales is the link.

spare capacity, thin order book.
Knowledge

Knowing sits in one head

The work can only be done by whoever knows it. Then handover is the constraint, not execution.

"you will have to ask her", and she is not in.
Speaker notes

Four places to look. The first is the familiar one: a step that cannot keep up. The second is missed most often: policy. A rule that was once clever, an approval that holds everyone up, a batch size from another era. Policy constraints are cheap to solve and hard to see.

The third is the market: if the chain can do more than is sold, sales is the link. And the fourth is knowledge: if the work can only be done by whoever knows it, handover is the brake. You recognise it by "you will have to ask her".

How we use it · in the iAi model

Which process do we work out first? The constraint.

  1. CoreWhat the organisation exists for, apart from its processes.
  2. Main groups and chain processesFrom demand to delivery, in big steps.
  3. First high-level SIPOCPer chain process: what comes in, what goes out.
  4. The choice: which detail process firstThis is where ToC fits. The process that limits the client's throughput most is the one we work out first, down to requirements. Not the easiest, not the most fun.
  5. Requirements, realisation, operationsFrom need to technology, and into use.
  • Why hereYou cannot work everything out in depth at once. The order decides where the first value lands. ToC makes that choice traceable instead of a gut feeling.
  • What it looked like at a manufacturerCore and chain processes mapped. Order processing, turning orders into a workable production schedule, pushed delivery reliability below the strategic 95 percent. That process first, the ones around it later.
  • And at homeThe same question is on every management meeting: what is our one constraint right now, and are we putting our hours there?
an AI or Odoo setup on a non-constraint feels productive, but does not improve the client's throughput.
Speaker notes

For us, ToC is not a loose theory but the engine under the iAi model. After we have taken an organisation apart, core, main groups, chain processes, a first SIPOC, we face the sharpest choice of the whole project: which detail process do we work out first, down to requirements.

ToC gives the answer: the process that limits the client's throughput most. At a manufacturer that was order processing, because it pushed delivery reliability below 95 percent. That process first. And we ask ourselves the same question in every management meeting.

The session · let's go

Find your constraint in four rounds

  1. Draw the chainFrom demand to delivered and paid, in five to eight steps. One line, no org chart. Twenty minutes.
  2. Where does the work pile up?Queues, full inboxes, "it is with", open tickets. The pile lies in front of the constraint. Put a red dot. Fifteen minutes.
  3. What does the constraint do that it does not have to?Exploit without investing: waiting, searching, rework, meetings. Cross it out. Fifteen minutes.
  4. Who runs faster than the constraint?Subordinate: what would that department do differently tomorrow? And which rule holds the constraint back? Twenty minutes.

On the board

One line with the chain steps, a number per step (orders, files, tickets per week), one red dot.

Rule of the game: one constraint. When in doubt you choose, and you test it in the next round.

The result

One sentence: "Our constraint is X, because Y piles up there, and next week we do Z to exploit it."

That is the detail process we work out first.

Speaker notes

Now you. Four rounds, about seventy minutes in all. Round one: draw the chain on one line, five to eight steps, from demand to delivered and paid. No org chart, a line.

Round two: where does the work pile up? That is the clue. The pile always lies in front of the constraint. Put a red dot. Round three: what does that step do that it does not have to? That is exploiting. Round four: who runs faster than the constraint, and which rule holds it back? That is subordinating and policy.

The result is one sentence. Our constraint is X, because Y piles up there, and next week we do Z. That sentence is the start of the detail process we work out first.

The session · the action plan

Fill in your five pairings

Type straight into the boxes. The text stays saved in this browser, and the button copies everything as text for the report.

Speaker notes

This is the action plan after the four rounds. The red dot from round two is pairing 1: goal and constraint. Fill in the rest together, out loud. Pairing 2: which one problem explains most of the shortage? Pairing 3: what do we gain and lose if we solve it, and if we do nothing? Pairing 4: what does a solution without trade-offs look like? Pairing 5: what do we test next week, and how do we see that it works?

The text stays in the browser and goes to the report as text with the button. One line per pairing is enough. What does not fit in one line is not a choice yet.

Remember

Find, focus, repeat

Three images

  • FindThe chain in your hands: you are not looking for the strongest link, but for the one that breaks first.
  • FocusThe drum: one instrument sets the beat, the rest of the band does not play faster than the drummer.
  • RepeatThe repaired link: as soon as it is strong, another one is the weakest. Back to the chain.

Three moments to recall it

  • Day 1Tell a colleague in three sentences what your constraint is and why.
  • Day 3Name the five focusing steps from memory. Which two cost no money?
  • Day 10Look at what you improved this week. Was it on the constraint, or next to it?
Speaker notes

Three images to hold on to. The chain: you look for the link that breaks first. The drum: one instrument sets the pace, the rest does not play faster. And the repaired link: as soon as it is strong, another one is the weakest.

And recall it instead of rereading it. Tomorrow retell it, in three days the five steps from memory, in ten days the honest question: was what I improved this week on the constraint?

To close
Improve the weakest link.
The rest waits.
Find Focus Repeat

Our advice: do not start an improvement project, a system setup or an AI application without first writing down the one sentence: our constraint is X, because Y piles up there. Work out that process first. The rest follows, and often cheaper.

Follow us for new knowledgeLinkedInInstagramFacebook
Speaker notes

Back to the start: improve the weakest link, the rest waits. Find, focus, repeat.